Vance Brand (CAPCOM)

Okay. Okay. We want back in again the next step which is “At burn attitude: VERB 40 NOUN 20, ENTER.”

Vance Brand (CAPCOM)

Okay. Proceeding on down, delete “At burn attitude” and the step above it, which is 400 plus 5.

Fred Haise (LMP)

400 plus 5 and the “at burn attitude.”

Vance Brand (CAPCOM)

Okay. That's all for page 32, Fred. Next, page 33.

Vance Brand (CAPCOM)

Okay. Under 4 minutes, minus 4 minutes, add back in MODE CONTROL, both, to ATT HOLD.

Fred Haise (LMP)

Okay. MODE CONTROL, both, to ATT HOLD.

Vance Brand (CAPCOM)

Okay. Two steps below that, add back in TTCA COMMANDER THROTTLE MIN DPS, and add in DPS.

Fred Haise (LMP)

TTC—Yes. Seems like you should be in JETS, since this is going to be—is this going to be RCS or a DPS burn?

Vance Brand (CAPCOM)

Okay. This will be JETS for RCS and THROTTLE for DPS.

Fred Haise (LMP)

What I don't understand is, what is this MCC likely to be? I thought it was going to be an RCS.

Vance Brand (CAPCOM)

Well, we—We expect that, but we're remaining flexible.

Fred Haise (LMP)

(Laughter) Okay. Okay. I'll put in TTCA THROTTLE MIN for DPS, JETS for RCS.

Vance Brand (CAPCOM)

That's correct. Okay. That's all on page 33. Go to page 34.

Vance Brand (CAPCOM)

Okay. Beneath everything on that page, add in the following. Return to “Entry,—LM PREP” check—return to “Entry, LM PREP” checklist —

Fred Haise (LMP)

Hold on, Vance; I don't understand. We want to delete everything on page 34?

Vance Brand (CAPCOM)

No, that's not correct, Fred. What we wait to do is leave everything the way it is on 34, and add this one comment I'm giving you at the—at the bottom of it.

Fred Haise (LMP)

Oh, okay. Okay. I misunderstood. Okay. Go ahead with your added comment.

Expand selection up Contract selection down Close
Vance Brand (CAPCOM)

Return to “Entry LM PREP checklist.”

Expand selection down Contract selection up

Spoken on April 17, 1970, 4:34 a.m. UTC (54 years, 7 months ago). Link to this transcript range is: Tweet

Fred Haise (LMP)

… turn to—return to “Entry, LM checklist?”

Vance Brand (CAPCOM)

That's affirm. At EI minus 5 hours.

Fred Haise (LMP)

Okay. At EI minus 5 hours. Let me take a look and see how that flows, now.

Vance Brand (CAPCOM)

Okay. And also you have a —

Fred Haise (LMP)

Okay. That would be the LM—the LM preentry procedure. Yes. Okay.

Vance Brand (CAPCOM)

That's correct, and, also on that page, you—from our last correct—or addition exercise, you have a section called “Reestablish PTC.” We'd like to scratch all of that, of course.

Vance Brand (CAPCOM)

Okay, Fred. That's all except for one comment that we have, and—just a second.

Vance Brand (CAPCOM)

Stand by 1. Fred, we're polling the room for comments here, any last minute thoughts from people. We'll be right back with you.

Vance Brand (CAPCOM)

Okay, Fred. Just two changes, comments to what we just gave you. The first is near the front at EI—in the section under “EI minus 2-1/2 hours,” power removal from CM LM umbilical." We'll let you turn to that.

Fred Haise (LMP)

Okay, I'm there at “EI minus 2-1/2 hours, power removal CM LM umbilical.”

Vance Brand (CAPCOM)

Okay. Under LM, we have a step, BAT 2, LOW VOLTAGE, OFF/RESET, than ON. Next we have a step BAT 2, HI VOLTAGE. OFF/RESET, then ON. We request that you wait in between these two steps for us to give you a GO. In other words, we'd like to look and see that all the relays closed and all that sort of thing before you throw BAT 2, HI VOLTAGE, to OFF/RESET, and ON.

Fred Haise (LMP)

Okay, After BAT 2, LOW VOLTAGE, OFF/RESET, I'll—then ON, I'll wait for a MSFN GO before proceeding.

Vance Brand (CAPCOM)

Right-o. Okay. Next, at—Under the section of “EI minus 1 hour and 45 minutes”—No, change that. Correction, “EI minus 1 hour, 35 minutes,” refer to the ECS section, and we have a change.

Fred Haise (LMP)

All right. Go ahead, Vance.

Vance Brand (CAPCOM)

Okay, Jim's right. We should cross out all this stuff with a couple of exceptions. FORWARD DUMP valve, closed, the first step, should remain. All other steps should be scratched, except for the last one, which is OVERHEAD DUMP valve, closed. That leaves two steps.

Fred Haise (LMP)

Okay. Under ECS, we delete all except the first step, FORWARD DUMP valve, close, and step 10, which is OVERHEAD DUMP valve, closed, and leave in verify transfer list.

Vance Brand (CAPCOM)

That's affirm. Leave in what follows, which is verify transfer list and IVT and all that.

Vance Brand (CAPCOM)

IVT, of course, meaning CDR transferring to the CM.

Fred Haise (LMP)

We wouldn't forget it.

Vance Brand (CAPCOM)

Okay, Fred-o. That's—That's the changes. Not quite as extensive as the CSM had, but still pretty long. Any comments or questions to the house here?

Fred Haise (LMP)

No, it looks pretty good to me, Vance.

Vance Brand (CAPCOM)

Okay. Very good. Only other comment, aside from the checklist, we've been watching your descent stage water, and it looks—or your ascent stage water, and it looks real good.