Fred Haise (LMP)

Okay. It says maneuver in ATT HOLD for Moon view attitude until CM platform release.

Vance Brand (CAPCOM)

That's affirm. Better worded, it would have been maneuver and hold in attitude for Moon view, et cetera.

Fred Haise (LMP)

Okay. That's mainly for Jack to be able to get it in the optics, you mean.

Vance Brand (CAPCOM)

Yes, that's correct. Okay, Fred —

Vance Brand (CAPCOM)

Could you give us a readback on everything up to this point?

Fred Haise (LMP)

Okay. I'll go back to NORMAL VOICE. It might—Or is this pretty clear?

Fred Haise (LMP)

Okay. The master title, “Entry, LM PREP, EI minus 6 hours.” First, BAT 5 NORMAL FEED, ON; second, use modified LM DPS/RCS, 30-minute activation checklist. Next, is at TEI minus 5 hours, MCC-7, if required. Now, we have a LM preentry procedure. First, we maneuver to service module SEP attitude. Second, configure for CSM hotfire. Under that, DEADBAND MAX, and ATTITUDE CONTROL, three, to PULSE. Thirdly, perform CSM hotfire. Fourth, we—The LM maneuvers back to SM SEP attitude, with ATTITUDE CONTROLs, PITCH and ROLL to PULSE, ATTITUDE CONTROL, YAW, to MODE CONTROL. Now, you got that so far, Vance?

Vance Brand (CAPCOM)

That's correct so far, Fred-o.

Fred Haise (LMP)

Okay. At EI minus 4-1/2 hours, configure for SM SEP. First, BALANCE COUPLE, ON. Secondly, zero the counters in AGS; 404, 405, 406, plus 0; read out 470. Thirdly, translate plus-X to 0.5 foot per second. Fourth, CM/SM SEP. Fifth, after SEP, null 470 to 0. Sixth, ATTITUDE CONTROL, three, to PULSE. Seventh, pitch to acquire service module for photos. And a note, use the ACA for control. Last, we had—you gave me was TEI minus 3 hours. Maneuver in ATT HOLD for Moon view until the CM platform release.

Vance Brand (CAPCOM)

Okay, Fred. Only—Only a minor point that we just picked up. At the very top, EI minus 6 hours, the title is “power up,” above BAT 5 NORMAL FEED, ON.

Fred Haise (LMP)

Okay. The title above BAT 5 NORMAL FEED, ON, is “power up.”

Vance Brand (CAPCOM)

Okay. And on the last, it was maneuver and ATT HOLD for Moon view attitude until CM platform release. I think that's what you read. Okay. Ready to go on? EI minus—Are you there?

Fred Haise (LMP)

Okay. Next is—Okay. Next is TEI minus what, Vance?

Vance Brand (CAPCOM)

It's—It's EI minus 2-1/2 hours, Fred.

Fred Haise (LMP)

Okay. EI minus 2-1/2.

Vance Brand (CAPCOM)

Okay. The title, “Power removal from CM LM umbilical.”

Fred Haise (LMP)

Okay. “Power removal from CM LM umbilical.”

Vance Brand (CAPCOM)

That's correct. Next, assumes—This assumes all descent batteries on line.

Fred Haise (LMP)

Okay. I'll put that as a note.

Vance Brand (CAPCOM)

And ASCENT BATTERIES 5 and 6 on NORMAL FEED.

Fred Haise (LMP)

Okay. This assumes all descent BATs on line, and ASCENT BATs 5 and 6 on NORMAL FEED. Go ahead.

Vance Brand (CAPCOM)

Roger. Next, CSM CB LM POWER 1, MAIN B to open.

Fred Haise (LMP)

Okay. CSM, CB LM POWER 1, MAIN B, open.

Vance Brand (CAPCOM)

Next. CB, LM POWER 2, MAIN B, open.

Fred Haise (LMP)

Okay. CSM, CB LM POWER 2, MAIN B, open.

Vance Brand (CAPCOM)

CB EPS SENSOR SIGNAL, MAIN B to open.

Fred Haise (LMP)

Okay. CB EPS SENSOR SIGNAL, MAIN B, open.

Vance Brand (CAPCOM)

Okay. Next, the LM. CB, EPS panels 11 and 16, CROSS TIE BALANCE LOADS to close.

Fred Haise (LMP)

Okay. On the LM side now. CB EPS 11, panels 11 and 16, CROSS TIE BAL LOADS, close.

Vance Brand (CAPCOM)

That's correct. Next, CB EPS panel 16, BAT FEED TIE, two of them, open.

Fred Haise (LMP)

Okay. LM, CB EPS, panel 16, BAT FEED TIE, two, open.

Vance Brand (CAPCOM)

Okay. CB EPS 16, ASCENT ECA CONTROL to close.

Fred Haise (LMP)

Okay. CB EPS panel 16, ASCENT ECA CONTROL, close.

Vance Brand (CAPCOM)

Correct. BATTERY 1, HI VOLT—HIGH VOLTAGE to OFF/RESET.

Fred Haise (LMP)

Okay. BATTERY 1, HI VOLT, OFF/RESET.

Fred Haise (LMP)

Okay. BATTERY 5, HI VOLT—or, it should be BATTERY 5 NORMAL FEED to OFF/RESET.

Fred Haise (LMP)

Or did you mean battery 2?

Jim Lovell (CDR)

Yes. I think that's what he meant.

Vance Brand (CAPCOM)

Okay. We mean BATTERY 5 to OFF/RESET.

Fred Haise (LMP)

BATTERY 5, NORMAL FEED—NORMAL FEED, OFF/RESET. Got you.

Vance Brand (CAPCOM)

Okay. BAT 2, LOW VOLTAGE, OFF/RESET then ON.

Fred Haise (LMP)

Okay. BATTERY 2, LOW VOLT, OFF/RESET, then ON.

Vance Brand (CAPCOM)

Next. BAT 2, HI VOLT, OFF/RESET, then ON.

Vance Brand (CAPCOM)

Roger. I didn't catch your readback, Fred.

Expand selection down Contract selection up

Spoken on April 17, 1970, 4 a.m. UTC (54 years, 8 months ago). Link to this transcript range is: Tweet

Fred Haise (LMP)

Oh, okay. The last item was item 9, and that was BAT 2, LOW VOLT, OFF/RESET, then ON.

Vance Brand (CAPCOM)

Roger. After that, I gave another one. BAT 2, HI VOLT, OFF/RESET, then ON.

Fred Haise (LMP)

Okay. BAT 2, HI VOLT, OFF/RESET, then ON.

Vance Brand (CAPCOM)

Correct. BAT 1, HI VOLT, ON.

Fred Haise (LMP)

Okay. BAT 1, HI VOLT, ON.

Fred Haise (LMP)

Okay. BAT 5, NORMAL FEED, ON.

Vance Brand (CAPCOM)

CB, EPS, 16, BAT FEED TIE, two of them, closed.

Fred Haise (LMP)

Okay. CB, EPS, 16, BAT FEED TIE, two, closed.

Vance Brand (CAPCOM)

Roger. Next. The LMP should transfer to the CM.

Fred Haise (LMP)

Okay. I'll underline that one. LMP transfer to CM.

Vance Brand (CAPCOM)

Don't let them forget you.

Vance Brand (CAPCOM)

Okay. And just before LMP transfer to CM, we'd like to have you add another step, Fred. That is —

Vance Brand (CAPCOM)

That is, CB, EPS, ASCENT ECA CONTROL, open.

Fred Haise (LMP)

Okay. You want CB—CB, EPS, that's on 16, I assume, ASCENT ECA CONTROL, open.

Vance Brand (CAPCOM)

Affirm. Okay. This is EI minus 1 hour 45 minutes, next.

Vance Brand (CAPCOM)

Okay. Maneuver to CM LM JETT attitude.

Vance Brand (CAPCOM)

And you'll have a pad for that attitude.

Fred Haise (LMP)

Okay. Maneuver to CM LM JETT attitude.

Vance Brand (CAPCOM)

That's affirm. Matter of fact, Jack has a listing of your pads there, Fred-o, so you can review them after this is over.

Vance Brand (CAPCOM)

EI minus 1 hour 35 minutes. Configure —

Fred Haise (LMP)

EI minus 1 hour 30.

Vance Brand (CAPCOM)

That's correct. Configure for jettison.

Vance Brand (CAPCOM)

Under that, verify CM free.

Vance Brand (CAPCOM)

Okay. Next, the COMM configuration. S-BAND, PM, PRIM.

Fred Haise (LMP)

Hold on. Say again now.

Vance Brand (CAPCOM)

Okay. Next, COMM configuration.

Fred Haise (LMP)

This is for the command module?

Vance Brand (CAPCOM)

Negative. The step above for CM free was command module, but the COMM is for LM again.

Vance Brand (CAPCOM)

Okay. S-BAND, PM, PRIMARY, PRIMARY again, OFF, PCM, RANGE, OFF, and HI.

Fred Haise (LMP)

Okay. Our S-BAND CONFIG is: PM, PRIM, PRIM, OFF, PCM, RANGE, OFF, HI.

Vance Brand (CAPCOM)

That's correct. Stand by 1.

Fred Haise (LMP)

Do you have any druthers about which OMNI?

Fred Haise (LMP)

Select—Did you say AFT, or best?

Fred Haise (LMP)

Okay. I was wondering if that's still going to be best after it leaves—But, okay. Select best OMNI at the time.

Vance Brand (CAPCOM)

That's affirm. Okay. We've covered COMM, Fred. Next, ECS.

Vance Brand (CAPCOM)

Okay. Under ECS, FORWARD DUMP valve, close.

Fred Haise (LMP)

Okay. FORWARD DUMP valve, close.

Vance Brand (CAPCOM)

SUIT CIRCUIT RELIEF, AUTO.

Fred Haise (LMP)

SUIT CIRCUIT RELIEF to AUTO.