- Vance Brand (CAPCOM)
-
Okay, Fred-o. Okay. This is “Entry, LM PREP.” Starts EI minus 6 hours. At that time, you power up the ACS. I think I'll give you a line at a time and, when I hear you say okay on that, I'll go to the next. That sound reasonable?
- Vance Brand (CAPCOM)
-
EI minus 5 hours. Midcourse-7, if required. Next: LM preentry procedure. And, Fred, the time on LM preentry procedure is just —
- Vance Brand (CAPCOM)
-
Okay. The time on the LM preentry procedure is just as soon as you finish midcourse-7, or 5 hours -
- Fred Haise (LMP)
-
Okay. I've got this TEI minus 5 hours, MCC-7 if required, and now you're going to start me a new procedure called LM preentry procedure. Go ahead.
- Vance Brand (CAPCOM)
-
Under that, DEADBAND, MAX; and ATTITUDE CONTROL, three, to PULSE.
Expand selection up Contract selection down Close - Fred Haise (LMP)
-
Okay. It says maneuver in ATT HOLD for Moon view attitude until CM platform release.
- Vance Brand (CAPCOM)
-
That's affirm. Better worded, it would have been maneuver and hold in attitude for Moon view, et cetera.
- Fred Haise (LMP)
-
Okay. The master title, “Entry, LM PREP, EI minus 6 hours.” First, BAT 5 NORMAL FEED, ON; second, use modified LM DPS/RCS, 30-minute activation checklist. Next, is at TEI minus 5 hours, MCC-7, if required. Now, we have a LM preentry procedure. First, we maneuver to service module SEP attitude. Second, configure for CSM hotfire. Under that, DEADBAND MAX, and ATTITUDE CONTROL, three, to PULSE. Thirdly, perform CSM hotfire. Fourth, we—The LM maneuvers back to SM SEP attitude, with ATTITUDE CONTROLs, PITCH and ROLL to PULSE, ATTITUDE CONTROL, YAW, to MODE CONTROL. Now, you got that so far, Vance?
- Fred Haise (LMP)
-
Okay. At EI minus 4-1/2 hours, configure for SM SEP. First, BALANCE COUPLE, ON. Secondly, zero the counters in AGS; 404, 405, 406, plus 0; read out 470. Thirdly, translate plus-X to 0.5 foot per second. Fourth, CM/SM SEP. Fifth, after SEP, null 470 to 0. Sixth, ATTITUDE CONTROL, three, to PULSE. Seventh, pitch to acquire service module for photos. And a note, use the ACA for control. Last, we had—you gave me was TEI minus 3 hours. Maneuver in ATT HOLD for Moon view until the CM platform release.
- Vance Brand (CAPCOM)
-
Okay, Fred. Only—Only a minor point that we just picked up. At the very top, EI minus 6 hours, the title is “power up,” above BAT 5 NORMAL FEED, ON.
- Vance Brand (CAPCOM)
-
Okay. And on the last, it was maneuver and ATT HOLD for Moon view attitude until CM platform release. I think that's what you read. Okay. Ready to go on? EI minus—Are you there?
- Vance Brand (CAPCOM)
-
And ASCENT BATTERIES 5 and 6 on NORMAL FEED.
Expand selection down Contract selection up - Fred Haise (LMP)
-
Okay. This assumes all descent BATs on line, and ASCENT BATs 5 and 6 on NORMAL FEED. Go ahead.
- Vance Brand (CAPCOM)
-
Okay. Next, the LM. CB, EPS panels 11 and 16, CROSS TIE BALANCE LOADS to close.
Spoken on April 17, 1970, 3:42 a.m. UTC (54 years, 6 months ago). Link to this transcript range is: Tweet