Ken Mattingly

That's correct. On panel 5: circuit breaker BATTERY RELAY BUS, BATTERY A and B, closed.

Jack Swigert (CMP)

CB BAT RELAY BUS, BAT A and B, closed.

Ken Mattingly

That's correct. Circuit breaker INVERTER CONTROL 1, 2, and 3, closed.

Jack Swigert (CMP)

CB INVERTER CONTROL 1, 2, and 3, closed.

Ken Mattingly

That's correct. On panel 3: AC INVERTER 1, MAIN A.

Jack Swigert (CMP)

Okay. Panel 3: AC INVERTER 1 to MAIN A.

Ken Mattingly

That's correct. Now, AC INVERTER 1, AC BUS 1, ON.

Jack Swigert (CMP)

Okay. AC INVERTER 1 to AC BUS 1 to ON.

Ken Mattingly

That's correct. And we're going to also put AC INVERTER 1, AC BUS 2, ON.

Jack Swigert (CMP)

Okay. AC INVERTER 1 to AC BUS 2, ON.

Ken Mattingly

That's correct. Back to panel 5. Circuit breaker EPS SENSOR SIGNAL, AC 1 and 2, closed.

Jack Swigert (CMP)

Stand by, Ken. I'm going to switch OMNIs here. You got cut out.

Jack Swigert (CMP)

Okay. Could you repeat that, please?

Ken Mattingly

Okay. On panel 5: circuit breakers EPS SENSOR SIGNAL, AC 1 and 2, closed.

Jack Swigert (CMP)

Okay. CB EPS SENSOR SIGNAL, AC 1 and AC 2, closed.

Ken Mattingly

That's correct. Circuit breaker EPS SENSOR UNIT, AC 1 and 2, closed.

Jack Swigert (CMP)

Okay. CBS—CB EPS SENSOR UNIT, AC 1 and AC 2, closed.

Ken Mattingly

That's correct. And circuit breaker CAUTION/WARNING, MAIN A, closed.

Jack Swigert (CMP)

CB CAUTION/WARNING, MAIN A, closed.

Ken Mattingly

That's correct. On panel 3: AC INVERTER, AC BUS 1 and 2, RESET and back to the center.

Jack Swigert (CMP)

AC INVERTER, BUS 1 and 2, RESET then center.

Ken Mattingly

That's correct. On panel 225: circuit breaker FLIGHT BUS, MAIN A and MAIN B, closed.

Jack Swigert (CMP)

Okay, panel—Okay, CB, FLIGHT BUS, MAIN A and MAIN B, closed.

Ken Mattingly

That's correct. CB CTE, MAIN A and MAIN B, closed.

Jack Swigert (CMP)

CB CTE, MAIN A and MAIN B, closed.

Ken Mattingly

That's correct. On panel 4: TELCOM, GROUP 1, AC1.

Jack Swigert (CMP)

TELCOM, GROUP 1, to AC1.

Ken Mattingly

And TELCOM, GROUP 2, to AC2.

Jack Swigert (CMP)

TELCOM, GROUP 2, to AC2.

Ken Mattingly

That's correct. On panel 3: S-BAND NORMAL, TRANSPONDER, to PRIMARY.

Jack Swigert (CMP)

S-BAND NORMAL, TRANSPONDER, to PRIMARY.

Ken Mattingly

That's correct. We want to take POWER, SCE, to NORMAL.

Jack Swigert (CMP)

POWER, SCE, to NORMAL.

Ken Mattingly

All right, and POWER, PMP, to NORMAL.

Jack Swigert (CMP)

POWER, PMP, to NORMAL.

Ken Mattingly

That's correct, and UP TELEMETRY, COMMAND RESET to RESET and then NORMAL.

Jack Swigert (CMP)

UP TELEMETRY, COMMAND RESET to RESET, then NORMAL.

Ken Mattingly

Okay. On panel 2: UP TELEMETRY, CMC, to ACCEPT.

Jack Swigert (CMP)

UP TELEMETRY, CMC to ACCEPT.

Ken Mattingly

On panel 275: circuit breaker FLIGHT/POSTLANDING, MAIN A and MAIN B, closed.

Jack Swigert (CMP)

A panel 275: CB FLIGHT/POSTLANDING, MAIN A and MAIN B, close.

Ken Mattingly

That's correct. And configure for COMM on panels 6, 9, and 10.

Expand selection up Contract selection down Close
Jack Swigert (CMP)

Okay, are you with me?

Ken Mattingly

All right. I assume you got that. Panel 5: circuit breaker IMU, MAIN A and MAIN B, closed.

Jack Swigert (CMP)

CB IMU, MAIN A and MAIN B, close.

Ken Mattingly

That's correct. Circuit breaker OPTICS, MAIN A and MAIN B, closed.

Jack Swigert (CMP)

Okay. CB OPTICS, MAIN A and MAIN B, close.

Expand selection down Contract selection up

Spoken on April 17, 1970, 2:07 a.m. UTC (54 years, 8 months ago). Link to this transcript range is: Tweet

Ken Mattingly

That's correct. CB G&N, POWER, AC1 and AC2, closed.