- Ken Mattingly
-
That's affirmative. Now back to panel 5: circuit breaker CAUTION AND WARNING, MAIN B, closed.
- Jack Swigert (CMP)
-
Okay, Ken. The COMM from you is awful weak—awful weak, I—I can't—it's CB EPS SENSOR UNIT. Say again, after that.
- Ken Mattingly
-
All right, Jack. That's CB EPS SENSOR UNIT, DC, that's Delta Charlie, BUS A and B, closed.
- Jack Swigert (CMP)
-
Okay. CB EPS SENSOR UNIT, DC BUS A and B, close. And I'll give you the volts and amps.
- Ken Mattingly
-
That's affirmative. Okay, now we're at EI minus 5 plus 05. And, as far as you're concerned, Jack, the command module is using this for information only. This will be the LM doing an Earth-terminator AGS alinement; and at the time of 5 plus 05 is the time they'll be going ahead and releasing their ball. And this will be covered in the LM checklist; it'll be uplinked after this one. At EI minus 5, we perform midcourse number 7. Over.
- Jack Swigert (CMP)
-
Okay. At EI minus 05:05, the LM is making an Earth-terminator aline; and at EI minus 05:00, we perform MCC-7.
Expand selection up Expand selection down Close - Ken Mattingly
-
That's correct. At the completion of midcourse 7, the LM will maneuver to a separation attitude. And this attitude will be sent up on one of the pads that you're going to get before all the sequence starts. And it'll be flown to the LM ball angles on that pad.
- Ken Mattingly
-
All right. At EI minus 4 plus 40, we want to perform page 1-6, step 39 of the entry checklist.
- Jack Swigert (CMP)
-
Ken, I—I didn't get it. We had to change OMNI's again. Could you say it—the EI minus 4 dash—or 04:40, we do something.
- Ken Mattingly
-
That's correct. Okay. The next is the command module RCS activation, and that's step 4-1 of page E/1-6.
- Ken Mattingly
-
All right, Jack. The next is at EI minus 4 plus 30. We want to verify that the LM is configured for command module RCS hotfire.
- Jack Swigert (CMP)
-
Okay. Let's repeat it. Stand by. Cut out. We've really got a strange attitude, so this is why we are having the COMM problem. Panel 5: CB G&N IMU HEATER, MAIN B, closed.
- Ken Mattingly
-
That's affirmative. On panel 1: ROTATION CONTROL POWER, NORMAL. That's two of them, to AC/DC.
Spoken on April 17, 1970, 1:43 a.m. UTC (54 years, 6 months ago). Link to this transcript range is: Tweet