Vance Brand (CAPCOM)

Okay. Next, panel 3: TRANSPONDER, PRIMARY; POWER AMPL, to PRIMARY, that's a verify; POWER AMPL, HIGH; MODE, VOICE, to OFF; POWER, SCE, to NORMAL; PMP to NORMAL; S-BAND ANTENNA, OMNI D, that's Delta. Okay, why don't you read that one back?

Jack Swigert (CMP)

Okay. On panel 3: TRANSPONDER to PRIMARY; POWER AMPLIFIER to PRIMARY; POWER AMPL, HIGH; MODE, VOICE, to OFF; POWER, SCE, to NORMAL; PMP to NORMAL; S-BAND ANTENNA, OMNI D, D as in Doggy.

Vance Brand (CAPCOM)

Hey, very good. Okay, panel 225: circuit breaker FLIGHT BUS, MAIN B, to close; circuit breaker CTE, MAIN B, to close. Panel 250: CB BAT C BAT CHARGER/EDS 2 to close.

Jack Swigert (CMP)

Hey, Vance, just a minute. Slow down, would you?

Jack Swigert (CMP)

Okay. I got distracted here. On panel 225: CB FLIGHT BUS, MAIN B, close; and then I lost you after that.

Vance Brand (CAPCOM)

Okay. After that, CB CTE, MAIN B, to close. Next, panel 250: CB BAT C BAT CHARGE/EDS2 to close; CB BAT C POWER ENTRY/POSTLANDING to close. Next, panel 275: CB MAIN B, BAT BUS B, to close; CB INVERTER POWER 2, MAIN B, to close. Okay. Incidentally, anything that I've given you up until now is not sequence critical, but from now on, it should be—you should be sure to do it in the sequence we give you. Why don't you read that back, Jack?

Jack Swigert (CMP)

Okay. Let me give you all of panel 225 again. CB FLIGHT BUS, MAIN B, close; CB CTE, MAIN B, close. On panel 250: CB BAT—B BAT CHARGE, that should be BAT C, Charlie, isn't it? BAT CHARGE/EDS2 closed?

Vance Brand (CAPCOM)

That's right. That's —

Jack Swigert (CMP)

CB BAT B POWER ENTRY -

Vance Brand (CAPCOM)

Okay. That should be BAT Charlie.

Jack Swigert (CMP)

Let me finish. Okay. That's what I thought. BAT Charlie BAT CHARGE/EDS2, close; BAT Baker POWER ENTRY/POSTLANDING, closed. On panel 275: CB MAIN B, BAT BUS B, closed; CB INVERTER POWER 2, MAIN B, closed.

Vance Brand (CAPCOM)

Okay. That's correct except for the second circuit breaker on panel 250, which is CB BAT Charlie POWER ENTRY slash POSTLANDING, close.

Jack Swigert (CMP)

Okay. BAT Charlie POWER ENTRY/POSTLANDING.

Vance Brand (CAPCOM)

Okay, now back to panel 250. CB BAT Bravo POWER ENTRY/POSTLANDING, close. Next, MDC 3, AC INVERTER 2 to MAIN B. AC INVERTER 2, AC BUS 1, on up. Next, panel 5: AC INVERTER AC BUS 1 to RESET and then center. Panel 3: UP TLM to COMMAND RESET then OFF. Then select best OMNI. Readback, please.

Jack Swigert (CMP)

Okay, Vance. The following steps are sequence critical. Panel 250: CB BAT B POWER ENTRY/POSTLANDING, closed. That's BAT Baker. MDC 3, AC INVERTER 2, to MAIN B; AC INVERTER 2, AC1, on. …

Vance Brand (CAPCOM)

How do you read now, Jack?

Jack Swigert (CMP)

Okay, Vance. Did you—how far did you—did you copy any of my steps there?

Vance Brand (CAPCOM)

Okay, I heard you through AC INVERTER 2, AC BUS 1 to on, and you were cut out by noise. Go ahead.

Jack Swigert (CMP)

Okay, Now comes to one I didn't understand. You said go over to MDC 5 and A in—AC INVERTER, AC BUS 1, RESET, then center, and then back to MDC 3; UP TELEMETRY, COMMAND RESET then OFF, and then select best OMNI.

Vance Brand (CAPCOM)

Roger. The readback's correct, but let me recheck that. Stand by.

Vance Brand (CAPCOM)

Jack, we were incorrect on panel 5; that should have been panel 3.

Jack Swigert (CMP)

Okay, that's good. I got it.

Vance Brand (CAPCOM)

Okay. Now, when you're in this configuration, the following onboard readouts are required. Panel 3: BAT C voltage, PYRO BAT A voltage, PYRO BAT B voltage, SPS HELIUM PRESSURE. And the following readouts on panel 101: CM RCS injector temperatures, those are positions 5 Charlie, 5 Delta, 6 Alfa, 6 Bravo, 6 Charlie, 6 Delta; and the battery manifold pressure, which is 4 Alfa. And standing by for readback.

Jack Swigert (CMP)

Okay. You want me to read out on MDC 3: BAT B voltage, PYRO A voltage, PYRO B voltage, SPS HELIUM PRESSURE. On panel 101: command module RCS injector temperatures; 5 Charlie, 5 Dog, 6 Alfa, 6 Baker, 6 Charlie, 6 Dog. The battery manifold pressure, 4 Alfa.

Vance Brand (CAPCOM)

Okay. Now—that was correct but I want to re-check the very first one, that was BAT Charlie voltage. Is that what you read back?

Jack Swigert (CMP)

Okay. Okay, BAT Charlie voltage. Seems like we're having a difference—I can't understand BAT Charlie from BAT Dog.

Vance Brand (CAPCOM)

Okay. Now, that—that complete procedure for getting into it, as far as getting into it's concerned. What I will give you now is how to back out of it after you're through with your readings. Are you ready to copy?

Expand selection up Contract selection down Close
Vance Brand (CAPCOM)

Okay. Now you'll back out fairly quickly after you go into this procedure. All we'll need is about 5 minutes of TM, and so if you're ready to copy, here it comes.

Vance Brand (CAPCOM)

Panel 3: POWER AMPL to OFF. Incidentally, copy this down on a piece of scratch paper as I read it, and then later I'll refer back to your first list where you can write things in the right-hand margin.

Jack Swigert (CMP)

Go ahead. You want—Repeat the one on panel 3 again, Vance.

Vance Brand (CAPCOM)

TRANSPONDER, OFF. AC INVERTER, 2, to OFF. Okay. Next, panel 250: CB BAT Bravo, POWER ENTRY/ POSTLANDING to open. Stand by 1.

Expand selection down Contract selection up

Spoken on April 16, 1970, 12:38 a.m. UTC (54 years, 6 months ago). Link to this transcript range is: Tweet

Vance Brand (CAPCOM)

Okay, Jack. What I just gave you now on the backout is the only thing that's order critical. From here on, you can go to the steps for initiating the procedure, and backtrack. In other words, you should go to each of the panels that I read up and put the circuit breakers back to the base-line configuration—or the switches. Over.

Jack Swigert (CMP)

Okay, now here's—to accent, here's the sequence-critical sets: POWER AMPL, OFF; TRANSPONDER OFF; AC INVERTER, 2, OFF; and the last one on panel 250, CB BAT Baker POWER ENTRY/POSTLANDING, open; and then hit the steps in reverse order that you gave them to me, and back out, like then I would start on MDC 3 UP TELEMETRY, OFF—to OFF; and then AC INVERTER—AC1 BUS 1 to OFF; and then AC INVERTER, 2, OFF; AC INVERTER, 2, MAIN B to OFF. Is that the type of order that you want to back out of?

Vance Brand (CAPCOM)

That's affirm, but—just for kicks, let's go through these panels again, and I'll give you the—the position, just to make sure there can be no doubt.

Vance Brand (CAPCOM)

Okay. And once again in the—in the area where I said order was not critical, it's still not critical when you back out. But now I'll go ahead. Okay, panel 4: TELCOMM, GROUP 1, AC1, it will not be AC1, it'll go to OFF. Panel 5: all circuit breakers on that panel which were positioned will now come to opened. Over.

Jack Swigert (CMP)

Okay. Panel 4: TELCOMM, GROUP 1 will go OFF. Panel 5: all the circuit breakers that we closed will go back to open.

Vance Brand (CAPCOM)

Okay. Panel 3: the first three lines have been taken care of already in my beginning in the backout procedure, so starting with MODE, VOICE, that should go back to VOICE. POWER, SCE, OFF; PMP, OFF; S-BAND ANTENNA, OMNI Bravo. Panel 225: CB FLIGHT BUS, MAIN B, open; CB CTE, MAIN B, open. Read back.

Jack Swigert (CMP)

Okay, Vance. I'm going to have to switch OMNIs. I'm starting to get some static here.

Jack Swigert (CMP)

Okay. How do you read on AFT OMNI?