Joe Kerwin (CAPCOM)

Okay. Skip the next one, and we want NUMERICS LIGHTING, OFF; FLOOD LIGHTS, OFF; and INTEGRAL LIGHTS, OFF. Over.

Joe Kerwin (CAPCOM)

Okay. On panel 101, skip the first three. We want URINE DUMP to OFF, and WASTE WATER DUMP to OFF. Over.

Joe Kerwin (CAPCOM)

Okay. On panel 122, the only change is CONDITION LAMPS to OFF. Over.

Joe Kerwin (CAPCOM)

Okay. Panel 162, no change. Panel 163, no change. Now add, in panel 201, FOOD WARMER to OFF. Over.

Joe Kerwin (CAPCOM)

Okay. On panel 225. It will read the same except I have three additional circuit breakers that we want open, and I'll read them up one at a time. The first one is S-BAND FM TRANSMITTER DSE, GROUP 1, open. Over.

Joe Kerwin (CAPCOM)

Roger that. The next one is FLIGHT BUS, MAIN A and MAIN B, and that's two breakers, both open.

Jack Swigert (CMP)

FLIGHT BUS, MAIN A, and FLIGHT BUS, MAIN B, two of them, open.

Joe Kerwin (CAPCOM)

Okay. That's correct. The last change is CTE, both open. Over.

Jack Swigert (CMP)

Could you say that again?

Joe Kerwin (CAPCOM)

Affirmative. CENTRAL TIMING EQUIPMENT, CTE, both open. Over.

Joe Kerwin (CAPCOM)

Affirmative. And that's all the changes on page 1-9.

Jack Swigert (CMP)

Okay. Let me read it back here. … order … POWER, OFF. NUMERICS LIGHTING, FLOOD LIGHTING, and INTEGRAL LIGHTING, three of them, OFF. Panel 101, URINE DUMP HEATERS, URINE DUMP to OFF, WASTE H2O to OFF. Panel 122, CONDITION LAMPS, OFF. Panel 201, FOOD WARMER, OFF. Panel 225, add additions that I read: S-BAND TRANSMITTER DSE, GROUP 1; FLIGHT BUS, MAIN A and MAIN B, CET, two to open.

Joe Kerwin (CAPCOM)

Okay. That's correct, Jack. Let's go to page 1-10. And on panel 226 —

Jack Swigert (CMP)

All right. We are going to switch on these. Got a switch on the …

Jack Swigert (CMP)

Okay. How you reading?

Joe Kerwin (CAPCOM)

Okay. Satisfactory, Jack. You ready for panel 226?

Joe Kerwin (CAPCOM)

Okay. On panel 226, we want all open except; so change word “Closed” to “Open” and then scratch out the next three lines because we want them open, too. Over.

Jack Swigert (CMP)

Okay. All open except and you're going to give the ones you want open.

Joe Kerwin (CAPCOM)

Right. I'll give you the opens now. We want LIGHTING: FLOOD, MAIN A, MAIN B, and FLIGHT/POSTLANDING, closed.

Expand selection down Contract selection up

Spoken on April 15, 1970, 3:38 p.m. UTC (54 years, 6 months ago). Link to this transcript range is: Tweet

Jack Swigert (CMP)

Okay. LIGHTING: FLOOD, MAIN A; LIGHTING: FLOOD, MAIN B, closed; and FLIGHT/POSTLANDING, closed.

Joe Kerwin (CAPCOM)

Roger, Jack. EECOM tells me that's all one circuit breaker, and the next one is LIGHTING: NUMERICS/INTEGRAL, LEB AC2, LMDC-AC1, and RMDC-AC1 to closed, and that's one circuit breaker also.

Jack Swigert (CMP)

Okay. I don't know whether I can read that all back. Okay, LIGHTING: NUMERIC/INTEGRAL and I didn't get the rest of it, Joe -

Joe Kerwin (CAPCOM)

Okay. Stand by 1 second while I make damn sure about this.

Joe Kerwin (CAPCOM)

Okay. On the 226 circuit breakers that I read up, they are—there are six circuit breakers involved and they're all—they're the first six from the left on the bottom row of the panel. They're under LIGHTING. We want the three FLOOD circuit breakers out and the three NUMERIC/INTEGRAL circuit breakers—I don't mean out, I mean closed. Those six closed and the rest open. Over.

Jack Swigert (CMP)

Okay. There are three FLOOD circuit breakers and three NUMERIC circuit breakers and you want all six of those closed.

Joe Kerwin (CAPCOM)

That's affirmative, Jack, and all the rest open. Okay. Panel 227, no change, and panel 229, one addition to the circuit breakers we want open, and those are the TIMERS, MAIN A and MAIN B, two, to open. Over.

Jack Swigert (CMP)

Okay. Okay, you want the TIMING circuit breakers, two of them, open.

Joe Kerwin (CAPCOM)

That's affirmative. Okay. On panel 250 —

Joe Kerwin (CAPCOM)

— we want all closed except, and then scratch out all the ones that are there.

Jack Swigert (CMP)

Okay. All closed except. Okay. I'm ready to copy.

Joe Kerwin (CAPCOM)

Wait 1 minute. Yes, EECOM caught me; I said that wrong. We want you to change the word “Closed” to “Open,” and then scratch out the ones that are there.

Joe Kerwin (CAPCOM)

Okay. The two that we want closed are SEQUENCER A and SEQUENCER B. Over.

Joe Kerwin (CAPCOM)

Say again, Jack. COMM is just improving.

Jack Swigert (CMP)

Okay. I had to switch OMNIs here. And the two you want all open on panel 250 except SEQUENCE A and SEQUENCE B.

Joe Kerwin (CAPCOM)

That's correct. Panel 251, no change; panel 252, WASTE STOWAGE VENT valve, closed. Over.

Jack Swigert (CMP)

WASTE STOWAGE VENT valve, closed.