- Joe Kerwin (CAPCOM)
-
Okay. On panel 6, skip the first one. We want POWER to OFF, and skip down then to SUIT POWER to OFF. Over.
- Joe Kerwin (CAPCOM)
-
Okay. On panel 7 we want EDS POWER, OFF. TVC SERVO POWER 1 and 2, OFF; FDAI/GPI POWER, OFF; and LOGIC 2 slash 3 POWER, OFF. Over.
Expand selection up Contract selection down Close - Jack Swigert (CMP)
-
Okay. I'll read back. SUIT COMPRESSOR 1 and 2, OFF; FUEL CELL PUMPS 1, 2, and 3, OFF; G/N POWER, OFF; MAIN BUS TIES, OFF; INTERIOR INTEGRAL LIGHTING, OFF; INTERIOR FLOODLIGHTING, OFF; then coming down, all circuit breakers on panel open; panel 6, the POWER should be OFF; SUIT POWER should be OFF; panel 7, all 5 of those switches should be OFF.
- Joe Kerwin (CAPCOM)
-
Okay, Jack. That's correct. Go to page 1-7. SCS ELECTRONICS POWER, OFF; SCS SIGNAL CONDITIONER/ DRIVER BIAS 1 and 2, OFF; and BMAG POWER, both, OFF; and DIRECT O2 valve to close. Over.
- Jack Swigert (CMP)
-
Okay. SCS ELECTRONICS POWER, OFF; both SIGNAL CONDITIONER/DRIVER BIAS POWER, OFF; BMAG POWER, two of them OFF; DIRECT O2 to close.
- Joe Kerwin (CAPCOM)
-
Okay. Now on panel 8, I'm going to have to read you a number of circuit breakers that we want open, and so start with CB panel 8 all closed except leave the two that we have there CM/RCS HEATERS, open, and FLOAT BAG open, and add the following. I'll read them up one at a time, and you can Roger. SCS LOGIC BUS, four, to open. Over.
- Joe Kerwin (CAPCOM)
-
Okay. That was the—Yes, the POSTLANDING VENT, that's FLT/PL, to open. The next are SCS DIRECT ULLAGE, two, to open.
- Joe Kerwin (CAPCOM)
-
That's correct, and the next ones are SM RCS HEATER A MAIN B, and HEATER C MAIN B, open.
- Joe Kerwin (CAPCOM)
-
That's correct, and SM RCS HEATER B MAIN A, open, and HEATER D MAIN A, open. Over.
- Joe Kerwin (CAPCOM)
-
Okay, Jack. That's the last of the additions to this page. Go back to the regular checklist, and go to the AUTO RCS SELECT switches. We want all 16 of them open. Over. That is OFF.
- Joe Kerwin (CAPCOM)
-
Okay. Then we go down to interior NUMERIC LIGHTING-LIGHTING, OFF; INTERIOR INTEGRAL LIGHTING, OFF; and INTERIOR FLOOD LIGHTING, OFF. Over.
- Joe Kerwin (CAPCOM)
-
Okay. Skip 3. We want SECs LOGIC, two OFF, down, and SECs PYRO ARM, two OFF, down. Over.
- Joe Kerwin (CAPCOM)
-
Okay, Jack. I don't think you need to read back all the circuit breakers because we copied them as you went. If you just want to read back—the panel 8, panel 9 changes.
- Jack Swigert (CMP)
-
All right, let's do it. SCS ELECTRONICS POWER, OFF. … panel 8. All 16 RCS switches, OFF. INTERIOR NUMERICS LIGHTING, OFF; INTERIOR INTEGRAL, OFF; INTERIOR FLOOD LIGHTING, OFF. SPS LOGIC, two, down and OFF. PYRO ARM, down and OFF. Then panel 9 is POWER to OFF.
- Joe Kerwin (CAPCOM)
-
Okay; that's correct, Jack. Let's go to page 1-8. In the second line, SUIT POWER's OFF. Over.
- Joe Kerwin (CAPCOM)
-
Good. SUIT POWER was OFF, and then go to panel 10, POWER, OFF, and SUIT POWER, OFF. Over.
Expand selection down Contract selection up - Joe Kerwin (CAPCOM)
-
That's correct. Go to page 1-9 and on panel 100, skip the first four. We want IMU POWER, OFF. Over.
Spoken on April 15, 1970, 3:27 p.m. UTC (54 years, 6 months ago). Link to this transcript range is: Tweet